Thanks for your interest in our Add-in for Microsoft Project. This page contains a link to download a fully-functioning version of the software. At the end of the trial period, the software will revert to the free edition, and advanced features will be disabled. At that point a license key will be required to restore the full functionality of the tool.
- Download and installation procedure:
- Before downloading, ensure that Microsoft Project is not running.
- If MS Internet Explorer (MSIE) or MS Edge is NOT your default browser, then STOP. Re-open this page in MSIE (or Edge). [Note that MSIE/Edge is not needed after this step.]
- Using MS Internet Explorer (MSIE) or MS Edge, click on the following link to execute the Microsoft ClickOnce Downloader.
- Startup procedure:
- Open Microsoft Project 2010/2013/2016 (Std or Pro).
- Click the Docs button on the new BPC ribbon to get started with the User Guide and other documents.
- Subscription procedure:
- Once the Trial proves satisfactory, users may purchase an annual subscription (by named user) using the “BUY/UPGRADE SUBSCRIPTION” button on the About/Upgrade tab of the Settings dialog (inside the Software).
[For a machine-locked (i.e. internet-independent) trial, send an email with subject – “BPC Logic Filter – Machine-Locked Trial Request” – from your corporate email address to support@boyleprojectconsulting.com. These trials are only for high-security environments. Requests from private users are not accepted.]