Problems with Driving Logic in Task Inspector and Task Paths (Microsoft Project 2010-2016)
Neither the Task Inspector nor the “Task Path” bar highlighter is a reliable indicator of task driving logic in Microsoft Project in the presence of mixed-type predecessor relationships or Backward Scheduling. At first glance, the Task Inspector pane in Microsoft Project (MSP) seems to be a reasonable tool for revealing the logic that is largely … Continue reading Problems with Driving Logic in Task Inspector and Task Paths (Microsoft Project 2010-2016)
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed