Video – Inspect and Step through Network Logic Links Using BPC Logic Filter
I’ve been using the JUMP buttons on the task logic inspector windows – a lot. These are great complements to the rest of BPC Logic Filter. [Dec’20: Here’s a different demo of the Limited Logic Inspector – essentially the same inspection and jumping functionality, but without the extra logic analysis.]
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed