P6 Multiple Float Path Analysis – Why Use Free Float Option

In Oracle Primavera P6, Multiple Float Path analysis is useful for identifying and organizing logic paths leading to a selected End activity in a schedule.  If the Driving Logic to the End activity is desired, then the Free Float option should be selected.  When I wrote about P6’s Multiple Float Path (MFP) analysis here, I … Continue reading P6 Multiple Float Path Analysis – Why Use Free Float Option