Relationship Free Float and Float Paths in Multi-Calendar Projects (P6 MFP Free Float Option)
This is a short article about the calculation and use of Relationship Free Float in Oracle Primavera P6, a project scheduling tool. [It amends my previous entry on Total Float and Free Float Options in P6’s Multiple Float Path Analysis. Both articles are further expanded (and corrected) by the technical paper presented at the 2020 … Continue reading Relationship Free Float and Float Paths in Multi-Calendar Projects (P6 MFP Free Float Option)
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed