Video – Inspect and Step through Network Logic Links Using BPC Logic Filter

I’ve been using the JUMP buttons on the task logic inspector windows – a lot.  These are great complements to the rest of BPC Logic Filter.

[Dec’20:  Here’s a different demo of the Limited Logic Inspector – essentially the same inspection and jumping functionality, but without the extra logic analysis.]

 

 

2 thoughts on “Video – Inspect and Step through Network Logic Links Using BPC Logic Filter”

  1. The new JUMP feature on the Logic Inspector tool is great. MS Project is limited on being able to trace a particular path throughout a schedule, this tool remedies that issue.

    Thanks Tom.

Leave a Reply

Your email address will not be published. Required fields are marked *