Video – Inspect and Jump through Network Logic Links Using BPC Logic Filter – LLI Edition

Here’s a video of the new Limited Logic Inspector (LLI) in action.  The LLI Edition of BPC Logic Filter is for those MS Project users looking to examine the schedule logic network, but without a need for advanced analysis or reporting of logic flow.  It’s pretty smooth.

Leave a Reply

Your email address will not be published.