BPC Logic Filter for Microsoft Project (21 Posts)

Video – Inspect and Jump through Network Logic Links Using BPC Logic Filter – LLI Edition

Multiple Critical Paths – Revisited with BPC Logic Filter

Construction CPM Conference 2019 – Schedule Logic in Microsoft Project

BPC Logic Filter – Version 1.5 Improvements

 

BPC Logic Filter in Microsoft Project 2013/2016

Extract the Logic Plan Inside Your Schedule – Project Virtual Conference 2018

Recent Improvements to BPC Logic Filter (Feb 2018)

Inspecting Task Resource Drivers with BPC Logic Filter for Microsoft Project

Video – Inspect and Step through Network Logic Links Using BPC Logic Filter

Inspecting Task Links with BPC Logic Filter for Microsoft Project

Microsoft Project Schedule Health Checking and Fixing using BPC Logic Filter

Troubleshooting Circular Task Relationships with BPC Logic Filter

Video – Compute Critical Path Drag in Microsoft Project with BPC Logic Filter

Video – Find the Driving Path for Key Milestones in Microsoft Project using BPC Logic Filter

Video – Analyze the Near-Longest Paths in Microsoft Project using BPC Logic Filter

Video – Find the Longest Path in Microsoft Project Using BPC Logic Filter

Video – Using BPC Logic Filter to Analyze Resource-Leveled Critical Path

Video – Logic Tracing Example in Microsoft Project

Tracing Near Longest Paths with BPC Logic Filter

A Logic Tracing Example in Microsoft Project

Musings on Critical Path Drag and Calendars in CPM Schedules

The Resource Critical Path – Logic Analysis of Resource-Leveled Schedules (MS Project), Part 2