2 thoughts on “Video – Inspect and Step through Network Logic Links Using BPC Logic Filter”

  1. The new JUMP feature on the Logic Inspector tool is great. MS Project is limited on being able to trace a particular path throughout a schedule, this tool remedies that issue.

    Thanks Tom.

Leave a Reply

Your email address will not be published.

CAPTCHA


This site uses Akismet to reduce spam. Learn how your comment data is processed.