General Project Planning and Scheduling – as Applied in P6 and MSP (11 Posts) Driving Logic Relationships in Project Schedules Overlapping Tasks in Project Schedules Alternate Definitions of Driving Logic Relationships in Project Schedules What is the Longest Path in a Project Schedule? Don’t Confuse Critical Tasks with Critical Paths in Project Schedules How to Find Multiple Critical Paths in a Single CPM Schedule Dangling Logic in Project Schedules AACE International Annual Meeting 2017 Mandatory Constraints in Microsoft Project and Primavera P6 Float is not Schedule Contingency, Except when it is Eddies and Checkdams: Odd Structures in CPM Logic Flow